Klášterec nad Ohří – Completion of the electrification of technology for the production of foam glass insulation
The scope of the work for the “Completion of the electrification of technology for the production of foam glass insulation” for LAHTI PRECISION OY (Finland) included the supply, delivery, transport, complete installation and testing of electrical equipment, cable lines and cables, including all structures, materials, equipment, components and services required for implementing the work. The project was undertaken in Klášterec nad Ohří (Verne Industrial Zone – in the production hall of Pittsburg Corning CR, s.r.o.) Difficult weather conditions from January to April hampered the progress of the project. The installation sites were open metal structures, several floors high, reaching 45 m above ground. As a result, project work was brought to a halt several times due to dangerous weather conditions.
Scope of the work: installation of approximately 600 m of cable support systems; installation of approximately 9,500 m of cables, installation of approximately 300 connection points. Work was completed with a final inspection of the electrical equipment and respective individual tests. The project was supervised directly by the customer’s employees and was performed in line with the time schedule. During construction, no safety regulations were breached and no emergency occurred. Construction was completed without defects and backlogs and to the customer’s full satisfaction.