References
The subject of the contract is to ensure the long-term operability of the I&C equipment for selected non-unit facilities in the Dukovany NPP, the establishment of an industrial communication network connecting individual operating assemblies, and the creation of a central control room for non-unit facilities. more
Replacement of supply, discharge, drainage and venting pipes, including piping components – fixtures on the essential service water (TVD) system from carbon design to stainless steel design, type 17 348. more
The complex replacement of sectional DC switchboards in the Dukovany Nuclear Power Plant. These switchboards distribute electricity between the rectifier, the battery and DC consumers, protects outlets against overload, cycling and capacity testing of the battery. more
The core focus of the contract is the preparation, monitoring and implementation of repairs of I&C equipment, including the provision of technical support to customers. Maintenance activities also include the provision of the required materials and spare parts within the framework of the comprehensive safety, integrity and reliability of the serviced equipment. more
The Cabling Management System (Systém správy kabeláže – SSK) is a specialized software tool to support the design,
implementation and operation of cabling systems for large technological systems, developed and used by our Company
for over 10 years. more
“Reconstruction of the highvoltage substation 6kV E105” on the premises of Mondi Štětí, Energy Division. This substation powers the technology of the K10 boiler. This contract involved dismantling the existing VH151 switchboard, with twenty-three arrays, and replacing it with a new UNIGEAR ZS1 switchboard produced by ABB, with eighteen arrays, including the preparation of design documentation. more
The scope of the work for the “Completion of the electrification of technology for the production of foam glass insulation” for LAHTI PRECISION OY (Finland) included the supply, delivery, transport, complete installation and testing of electrical equipment, cable lines and cables, including all structures, materials, equipment, components and services. more
The scope of this work included the design and implementation of an optimum technical and economic solution for the complete coverage of in-house consumption of electricity in the power plant from the R01 ENO A substation, using the capacity of units 1, 2 of ENO B. more